OEM ODM Durable Light Steel Frame Construction Metal Building Auto Repair Shop
Product Details:
Place of Origin: | MADE IN CHINA |
Brand Name: | TESIA |
Certification: | CE |
Payment & Shipping Terms:
Minimum Order Quantity: | 1pcs |
---|---|
Price: | negotiate |
Packaging Details: | EO Standard packaging materials and experienced packaging workers |
Delivery Time: | 20days-30days |
Payment Terms: | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Supply Ability: | 6000set/month |
Detail Information |
|||
Product Name: | Steel Structure Building | Application: | Frame Part |
---|---|---|---|
Design Style: | Modern | Structure Type: | Light Steel Structre |
Wall&Roof Panel: | Sandwich Panel | Main Frame: | Sqaure Tube And H Section Steel |
High Light: | ODM Durable Light Steel Frame Construction,355B Light Steel Frame Construction,OEM metal building auto repair shop |
Product Description
Durable Using Low Price Steel Structure Automotive Chain Processing Workshop
Steel structure workshop building
|
|
Item
|
Specification
|
Steel column
|
Q235,355B welded H section steel/hot-rolled H section steel
|
Steel beam
|
Q235,355B welded H section steel/hot-rolled H section steel
|
Steel purlin
|
C/Z section purlin or square tube
|
Downpipe
|
UPVC
|
Gutter
|
Stainless steel gutter/UPVC gutter
|
Roof material
|
Corrugated steel sheet/sandwich panel
|
Wall material
|
Corrugated steel sheet/sandwich panel
|
Door
|
Rolling door
|
Window
|
Aluminium window
|
1. Cost Savings Price per square meter can be 25% lower than conventional buildings. Site erection cost is low because of faster erection times and easier process.
2. Quality Control Designed and fabricated in-factory with strict quality control. The fabrication process includes design and engineering, as well as detailing and manufacturing at the factory.
3. Quick Erection All steel components are fabricated at the factory and linked by bolts at the site. So the erection process is fast, step by step, easy to install.
4. Flexibility Steel buildings are flexible in any requirement of design, easy to expand in the future and also economically with low transportation costs.
5. Energy Efficiency Nowadays, steel buildings are the green solution for the environment with CO2 reduction, energy efficiency, and recycle. How to build a steel building with Xinguangzheng? Each of Xinguangzheng's steel building is customized to meet the needs of our customers with high performance, efficiency and international quality standards.
Installation of steel structure workshop
1.Foundation construction (pre-embedded anchor bolts), detail need to according to the foundation construction drawing; 2.Column installation One worker commands truck crane how to move, 3 ~ 4 workers cooperate with crane to install the steel column, put column to anchor bolt location;
3.Beam installation After completing the installation of adjacent two steel column, then main beam begin to install. 4.Installing roof & wall purlin The roof and wall purlin will be installed after finishing column and beam. Bolting the purlin on the main structure.
5.Fixing wall and roof sheet To fix the wall sheet on wall purlin by self-tapping screw; then fix the roof sheet;
6.Fixing the cover To install the cover on the corner, eave, window and door opening;
7.Install windows and sandwich panel slidng doors.